Copyright © 2023 ESCI, LLC - All Rights Reserved.
AT123D Load Parameters
The AT123D load parameters
contain information
describing the mass release
and timing.
Initial Concentration
Establishes the initial
concentration within the
contaminated groundwater
plume.
Initial Mass Load
A single contaminant release
within the groundwater plume
at the start of the model run.
Multiple Mass Loads (Load Release Rate)
Application of a separate contaminant mass load for each monthly time step. This feature is used to link AT123D
to the SESOIL vadose zone model.
Instantaneous or Continuous Release
Specifies if the release is instantaneous or continuous over a time step. The value is set to continuous when linked
to SESOIL. This means the mass release takes a month. The instantaneous release is typically used to simulate an
existing groundwater plume.
Transport and fate modeling software